[Power Reduction Test Case 6] Amusement Facility
Power-saving device confirmation test results for amusement facilities in Ishikawa Prefecture.
Industry: Amusement Facility (within Ishikawa Prefecture) Target Equipment: Air Conditioning Units Test Period: August 9, 2024 - September 20, 2024 Target Devices: Store Air Conditioning Units Model Number Quantity Set Temperature Unit 1: SZVYP1400K 1 unit (4 outdoor units) 25℃ Unit 2: SZVYP1400K 1 unit (4 outdoor units) 25℃ Analysis Method: With the air conditioning units in the ON state as a condition, the total current values for each hour were calculated. Data was compared before installation (OFF) and after installation (ON) for values where the outdoor temperature and indoor temperature were equivalent (the closest values) and where the number of operating air conditioning units was the same, to determine the average reduction rate. Result: 20.2% (Proposed reduction rate: 15%)
basic information
For more details, please refer to the related links or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the related links or feel free to contact us.