大谷商会 Official site

[Information] RiMM Standard Scenario Series Release Status

Forward falls, crashes, and accidents such as falls from scaffolding at construction sites. Introducing over 100 standard scenario series.

This document introduces the standard scenario series of "RiMM" that our company handles. It includes scenarios such as the forward fall and drop disaster "RiMM SCE-005," the plant handrail corrosion fall disaster "RiMM SCE-047," and the construction site scaffolding fall disaster "RiMM SCE-052." We offer over 100 types of standard scenario series, so please take a look. 【Featured Products (Excerpt)】 ■ Forward fall and drop disaster "RiMM SCE-005" ■ Power panel electric shock disaster "RiMM SCE-006" ■ Drill press entanglement disaster "RiMM SCE-007" ■ Conveyor belt entrapment disaster "RiMM SCE-008" ■ Forklift forward/reverse disaster "RiMM SCE-009" *For more details, please refer to the PDF document or feel free to contact us.

Related Link - http://www.otani-shokai.com/

basic information

【Other Listed Products (Excerpt)】 ■ Plant Handrail Corrosion Fall Accident "RiMM SCE-047" ■ Plant Mesh Steel Plate Opening Fall Accident "RiMM SCE-048" ■ Plant Pipe Inspection Opening Fall "RiMM SCE-049" ■ Logistics Tanker Fueling Fall "RiMM SCE-050" ■ Factory Mesh Steel Plate Corrosion Fall Accident "RiMM SCE-051" ■ Construction Site Scaffold Fall Accident "RiMM SCE-052" etc. *For more details, please refer to the PDF document or feel free to contact us.

Price range

Delivery Time

Applications/Examples of results

For more details, please refer to the PDF document or feel free to contact us.

[Information] RiMM Standard Scenario Series Release Status

OTHER

Recommended products

Distributors