[Customer Case Study] Putzmeister Piston Pump
We would like to introduce a case study of the introduction of the Putzmeister piston pump at Sumitomo Osaka Cement Co., Ltd.
At Sumitomo Osaka Cement Co., Ltd., the number of requests for sludge collection via sludge pumping at each factory exceeded expectations, prompting consideration for the expansion of the line. In the transportation section, it was required that sludge with low moisture content and the possibility of foreign matter contamination could be pumped stably into the cement kiln without any pretreatment. Therefore, we introduced the 'Putzmeister piston pump,' which excels in foreign matter handling capability and simplicity of design. After the introduction, it was highly praised for being able to "pump foreign matter up to 1/3 the size of the piping without any issues." 【Benefits of Introduction】 ■ Foreign matter handling capability met expectations ■ A quiet machine that requires no maintenance ■ Good after-sales service ■ Reliable maintenance system including parts inventory *For more details, please refer to the PDF document or feel free to contact us.
basic information
【Case Study】 ■Issues - There is a possibility of foreign matter contamination due to low moisture content in the transport section. - We want to stably pump sludge without pre-treatment into the cement kiln. ■Proposal - Introduction of the "Putzmeister piston pump," which excels in foreign matter handling and mechanical simplicity. *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.