3D displacement measurement system rental
3D displacement measurement system rental
This is a system that automatically measures the displacement of structures such as slopes and bridge piers. Reflective prisms are installed at the points where displacement measurement is desired, and measurements of the reflective prisms are sequentially taken from a total station set up at a fixed point, calculating the displacement amount for each point. The computer side performs automatic measurements through command control of the total station, calculates coordinate values and displacement amounts, and records data. If a displacement exceeding the pre-set allowable value is measured, an alarm system can be activated. ***Features*** - Capable of measuring up to 100 points with a single system. - Automatic weather correction is possible. - Displacement amounts can be visually confirmed. - Total station selection can be made according to required accuracy. ***Applications*** - Construction in areas surrounding national highways and expressways. - Settlement and lateral displacement of roads during underground tunnel construction.
basic information
This is a system that automatically measures the displacement of structures such as slopes and bridge piers. Reflective prisms are installed at points where displacement measurement is desired, and measurements of the reflective prisms are sequentially taken from a total station installed at a fixed point, calculating the displacement amounts for each point. The computer side performs automatic measurements through command control of the total station, calculates coordinate values and displacement amounts, and records data. If a displacement exceeding the pre-set tolerance is measured, an alarm system can be activated. ***Features*** - Up to 100 measurement points can be measured with a single system. - Automatic weather correction is possible. - Displacement amounts can be visually confirmed. - The total station can be selected according to the required accuracy. ***Applications*** - Construction in areas around national highways and expressways. - Subsidence and lateral displacement of roads during underground tunnel construction.
Price information
-
Delivery Time
Model number/Brand name
Rex Original
Applications/Examples of results
October 2009 Rinkai Nissan Construction Co., Ltd. Public Sho Area Ground Improvement Work February 2010 Spatial Information Service Co., Ltd. @ Ishii Surveying Co., Ltd. Technical Department February 2010 Chiba Tochi Co., Ltd. February 2010 Fuji Surveying Co., Ltd. Surveying Department February 2010 Terada Surveying Design Co., Ltd. January 2010 Spatial Information Service Co., Ltd. @ Ishii Surveying Co., Ltd. Technical Department December 2009 Epoch Co., Ltd. Narita City Delivery for Hanyu December 2009 - January 2010 Goyo Construction Co., Ltd. Maizuru Port Maejima Quay Construction Office December 2009 - February 2010 Muramoto Construction Co., Ltd. Public Sho Area Okemoto Construction Work March 2008 - July 2008 Kajima Corporation Existing Head Office Building Demolition Work for Buildings 1, 2, and 3, Minato Ward, Tokyo August 2003 - March 2004 Dai Nippon Civil Engineering Co., Ltd. Emergency Work for Slope Protection of the New Yamashina Water Purification Plant High Zone Water Tank, Kyoto City, Kyoto Prefecture August 2002 - January 2003 Foundation Ground Consultants Co., Ltd. Displacement Measurement for Narita Express Proximity Work, Taito Ward, Tokyo