Tide level data transmission system rental
Real-time monitoring of tide levels and water levels in distant locations!!
This is a system for real-time monitoring of tide levels by wirelessly transmitting tide level data measured at a measurement station to confirmation locations such as workboats and offices using a wireless modem. A measurement box and a wireless modem for transmission are installed at the measurement location, and power is supplied. At the location where data needs to be confirmed, a computer and a wireless modem for reception are set up, and once configured, measurements can be taken. Depending on the required variability and accuracy, an optimal configuration based on four types of sensors can be selected. ***Applications*** - Measurement of tide levels during marine construction and water-based projects, such as dredging and seabed improvement. - Management and monitoring of water levels in dams, ponds, and reservoirs, as well as in rivers and lakes. - Monitoring and verification of groundwater levels, such as well water and underground water. - Alarm systems for flood conditions in rivers. - Various other applications for measuring the depth of liquids.
basic information
***Features*** - The measurement station continuously measures the water level and transmits instantaneous values in real-time via wireless communication. - At the confirmation location, data sent from the measurement station is received and displayed/recorded in real-time while being calculated over a user-defined average time. - By setting offsets and specific gravity coefficients, it can accommodate various liquids. - By using sensors suited to the application, measurements can be taken at the required water depth and accuracy. - By using a solar battery set, it is possible to measure water level data even in locations where power supply is not available. - By adding additional receiving stations, it is possible to receive the same data at multiple locations. - By using an alarm system, monitoring of warning water levels can be conducted. - Since measurement values are transmitted in real-time, abnormalities can be confirmed instantly. - Because it uses low-power radio communication, there is no need for opening applications or contract procedures, and it does not incur communication costs. - It uses a hydrostatic water level gauge, allowing for long-term operation. - Data is saved in a format that can be read by Excel, making it easy to create graphs and reports.
Price information
The price varies depending on the duration and specifications for rental. We will create a quotation after confirming the details.
Delivery Time
Model number/Brand name
Rex Original
Applications/Examples of results
March 2010, Kamitaki Co., Ltd. December 2009 - January 2010, Soil Technica Co., Ltd., Oura Worksite November 2009 - December 2009, Fudo Tetra Co., Ltd., Ootsubo Construction Co., Ltd., Takashima Worksite December 2009 - January 2010, Kamiyama Manufacturing Co., Ltd., (Mizukami Yoko Co., Ltd.), Fudo Tetra Co., Ltd., Shin Wakato Worksite September 2009 - September 2009, Wakabuki Construction Co., Ltd., Construction of the quay (-13m) in the outer port area of Matsuyama June 2009 - June 2009, Fujiken Nagasaki Co., Ltd., Kai Kou Construction Co., Ltd. May 2009 - August 2009, Fudo Tetra Co., Ltd., Niigata West Coast Worksite January 2009 - March 2009, Seihou Industry Co., Ltd., Dredging work for Sakai Izumi North Assistance Route (-14m), Takaishi City, Osaka Prefecture December 2008 - January 2009, Fudo Tetra Co., Ltd., Nippan Aburatsu Port Worksite, Nippan City, Miyazaki Prefecture August 2008 - October 2008, Higashi-gumi Co., Ltd., Dredging work in the Kitako area of Wakayama Shimizu Port, Wakayama City, Wakayama Prefecture