ローバル Official site

[Product Introduction Case] Renovation Painting of a Multi-Story Parking Lot

With fewer work processes and quick-drying properties, the global can be delivered immediately!

We would like to introduce a case study of the renovation painting of a multi-story parking lot. Many of the galvanized components used in multi-story parking lots have a thin coating, which can lead to rust developing within a few years. After removing the rust, applying a coating of Robal over the entire surface provides the same effect as re-galvanizing, protecting the multi-story parking lot from rust for an extended period without maintenance. Additionally, the process involves fewer steps and has quick-drying properties, allowing for handover within a day, thus reducing the burden on construction and the inconvenience for residents. 【Benefits of Implementation】 ■ Easy to schedule - Flexibly accommodates changes in the construction schedule due to weather and other factors. ■ Reduced burden and costs for residents - Reduces the burden on residents, as well as costs such as labor, scaffolding, and alternative parking during the construction period. ■ Maintains the aesthetic appeal of the building over a long period, protecting its important asset value as a property. *For more details, please refer to the PDF document or feel free to contact us.

Related Link - https://www.roval.co.jp/use/case_study/case05.html

basic information

For more details, please refer to the PDF document or feel free to contact us.

Price range

Delivery Time

Applications/Examples of results

For more details, please refer to the PDF document or feel free to contact us.

Global Comprehensive Catalog

CATALOG

Recommended products

Distributors