サンミナーSCIシステムズ・ジャパン 本社 Official site

[42Q Case Study] Engineering Company

Improvement of key performance indicators! A case of digital transformation of operations in just 3 months.

We would like to introduce a case study of the cloud-based production management system MES "42Q" implemented at an engineering company. The company found that their existing paper-based approach to managing operations made tracking and real-time data visualization difficult, and the new system needed to be fully integrated with SAP. Without interrupting production, the system was fully implemented and integrated with the customer's ERP system in just three months. They were able to transition their manufacturing operations from a paper-based system to a digital MES without incurring any fixed costs. 【Case Overview】 ■ Challenge: The new system needed to be fully integrated with SAP ■ Benefits - Remote deployment - Process mapping - Flexible customized solutions *For more details, please refer to the PDF document or feel free to contact Sanmina.

Related Link - https://www.sanmina.com/solutions-contract-manufac…

basic information

【Results】 ■Integration with the customer's ERP system ■Transitioning manufacturing operations from a paper-based system to a digital MES without incurring any fixed costs ■Real-time access to complete traceability, work-in-progress, yield, and traceability data ■Improvements in key metrics reported within a quarter of the operational days *For more details, please refer to the PDF document or feel free to contact us.

Price range

Delivery Time

Applications/Examples of results

For more details, please refer to the PDF document or feel free to contact us.

[42Q Case Study] Engineering Company

TECHNICAL

Sanmina Company Introduction

COMPANY

Introduction materials for the cloud-based MES solution '42Q'

CATALOG

Recommended products

Distributors