(S machining) Sludge recovery Success case 2 (Significant reduction in "sludge accumulation" in the coolant tank of the machining center!)

サノテック
1. Background of Introduction - The conveyor alone could not remove the fine sludge generated during the cast iron processing, resulting in sludge accumulation of about half the tank within three months, necessitating line stoppages for tank cleaning each time... 2. Effects After Introduction - After installation, the amount of accumulation over six months was visibly reduced, allowing for cleaning to be done once every six months instead of once every three months... ★ For more details, please be sure to check the "Case Study Materials"! ☆ We can provide proposals based on usage conditions and installation environments in collaboration with the manufacturer.