(Surface Grinding) Sludge Recovery Success Case 3 (High squeezing performance, just liquid replenishment is enough, and industrial waste disposal is easy!)

サノテック
1. Background of Introduction - We were troubled by the maintenance burden of regular tank cleaning and liquid replacement due to the deterioration of coolant. 2. Effects After Introduction - We are very satisfied with the sludge recovery rate and dewatering performance; the recovery rate has tripled compared to conventional machines. ★ For more details, please be sure to check the "Case Study Materials"! ☆ We can provide proposals based on usage conditions and installation environments in collaboration with the manufacturer.
