(S machining) Sludge Recovery Success Case 2 (Significant reduction in "sludge accumulation" in the coolant tank of the machining center!)
サノテック
1. Background of Introduction - The conveyor alone could not remove the fine sludge generated during the cast iron processing, resulting in sludge accumulating to about half of the tank within three months, necessitating a line stop each time for tank cleaning... 2. Effects After Introduction - After installation, the amount of accumulation over six months was visibly reduced, allowing for cleaning to be done once every six months instead of once every three months... ★ For more details, please be sure to check the "Case Study Materials"! ☆ We can provide proposals based on usage conditions and installation environments in collaboration with the manufacturer.