Red Water Countermeasures (13 Years After Construction, 30 Households) [Magnetic Water Treatment Device Vol. 6]
Adopting an independent circulation system! Installing PI-25CF (3-piece set) in a 13-year-old, 30-unit apartment building.
We would like to introduce a case of red water countermeasures implemented at East Side Palace T&T (a 30-unit condominium built 13 years ago) by Testa Corporation. We installed the PI-25CF (3-point set). We adopted an independent circulation method that extracts water from the suction side of the pump, processes it through a polar treatment, and then feeds it into the water tank via a blow pipe. [Case Details] - Installation Location: East Side Palace T&T, Testa Corporation - Installation Date: August 26, 2002 - Installation Time: Approximately 5 hours; no water outage due to the presence of an elevated water tank - Polar Model: PI-25CF (3-point set) *For more details, please refer to the PDF document or feel free to contact us.
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.