Improving productivity and efficiency, equipment review (1) [Case study for problem-solving]
Introducing a case study on the improvement of press accuracy and the update of hydraulic units used in tile forming presses.
At equipment manufacturer T, an existing hydraulic unit delivered by another company several decades ago failed, and the manufacturer's response was poor, leading them to request a replacement with a new unit from us. They also requested an increase in the cycle time compared to the existing unit. We proposed the NACHI servo unit "NPQ-100-11KPZ70N4-A2-6161A" along with a complete hydraulic circuit that meets the specifications. We received positive feedback that the requested specifications were achieved and that the production capacity of the equipment increased. [Case Study] ■ Equipment Manufacturer T ■ Concerns and Consultations - Existing hydraulic unit delivered by another company failed - Request to increase cycle time compared to the existing unit ■ Proposal and Results - Proposed a servo unit and complete hydraulic circuit that meet the specifications - Increased production capacity of the equipment *For more details, please feel free to contact us.
basic information
For more details, please feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please feel free to contact us.