伸栄産業 Official site

Concerns about deadlines [Case Study of Problem Solving]

Introducing a case of an IAI-made robot with a gantry-type tabletop order.

At Equipment Manufacturer A, there were considerations for a tabletop robot project involving multiple manufacturers, but they were struggling with decisions due to long lead times and high costs. Therefore, taking into account the customer's desired specifications, budget, and delivery time, we proposed IAI's tabletop solution. As a result, with the involvement of the manufacturer in sales efforts, we were able to shorten the delivery time and reduce costs. Additionally, we conducted an IAI study session within the customer's company, which they appreciated as it helped them better understand how to use the product. By leveraging our connections with various suppliers, we were able to make proposals that maximized benefits for the customer. *For more details, please feel free to contact us.*

Related Link - http://www.shine-san.co.jp/jirei/

basic information

【Case Study】 ■ Equipment Manufacturer Company A ■ Concerns and Consultations - Considering concepts for tabletop robots from multiple manufacturers - Struggling with decision-making due to long lead times and high costs ■ Proposal and Results - Proposed IAI's tabletop robot - Leads to shorter lead times and cost reduction *For more details, please feel free to contact us.

Price range

Delivery Time

Applications/Examples of results

For more details, please feel free to contact us.

Recommended products

Distributors