ショウエイ 本社 Official site

[Example of Split Assembly Structure] Cover

After canning, welding, and shaping each part, we conduct a temporary assembly! Here are examples of split assembly structures.

We would like to introduce a case study of a split assembly structure for covers conducted by Shoei. The processing methods include laser cutting, roll bending, can manufacturing, welding, shaping, finishing, assembly, and painting. After can manufacturing, welding, and shaping for each part, we perform a trial assembly and conduct dimensional inspections. Please feel free to contact us when you need our services. 【Case Overview】 ■ Material: SUS304 6.0t Outer diameter φ2,700 ■ Processing Methods: - Laser cutting, roll bending, can manufacturing, welding, shaping, finishing, assembly, painting ■ Key Points during Processing: - Trial assembly and dimensional inspection are conducted after can manufacturing, welding, and shaping for each part ■ Delivery Time & Price: 2.5 months & competitive ■ Industry: Heavy electrical equipment *For more details, please refer to the PDF document or feel free to contact us.

Related Link - http://www.shoueigp.jp/

basic information

For more details, please refer to the PDF document or feel free to contact us.

Price range

Delivery Time

Applications/Examples of results

For more details, please refer to the PDF document or feel free to contact us.

Case Studies of Problem Solving and Processing

TECHNICAL

Distributors

Recommended products