[Production Example] Large Tank (Water Filling / Fire Department Inspection)
Water filling (32,000 liters) - Fire inspection support is also available! Introducing examples of large tank production.
We would like to introduce the water filling and fire inspection processes for the case of manufacturing a vertical cylindrical tank (φ2600, H8000). Our company is capable of handling water filling (32,000 liters) and fire inspection. In this process, we conducted PT inspection, leak checks, and ultrasonic testing. We have undertaken numerous projects in the manufacturing of enclosures for power equipment, air conditioning equipment, food equipment, special machinery, and special vehicles, starting from the prototype stage. We have received high praise from our customers for our welding technology on thick plates in large-scale can manufacturing. 【Case Overview】 ■ Material: SS400 ■ Processing Method: PT inspection, leak check, ultrasonic testing ■ Delivery Time: 5 days ■ Industry: Food, Plant, Construction *For more details, please refer to the PDF document or feel free to contact us.
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.