ショウエイ 本社 Official site

[Large Canned Product Case] Post-Canning Assembly Inspection

Procurement of large plate roll processed materials, optional supplementary installation, deformation prevention, and inspection conducted after integrated assembly in the workplace!

We would like to introduce a case where our company conducted post-assembly inspection of large fabricated cans. We procured large plate roll processed materials, installed optional reinforcements, prevented deformation, and conducted inspections after integrated assembly at the work site. Our company possesses high welding technology and precision sheet metal processing capabilities that can handle a wide range of fabrication, from thin to thick materials, as well as pipe piping and large fabricated structures, allowing us to meet various customer needs. Please feel free to contact us when you need our services. 【Case Overview】 ■ Material: SM400A 9.0t×φ4,900×H2,100 ■ Processing Methods: - From roll plates, fabrication, welding, shot blasting, to painting - On-site inspection for three-part assembly ■ Delivery Time: 2.5 months ■ Industry: Heavy electrical equipment related *For more details, please refer to the PDF document or feel free to contact us.

Related Link - http://www.shoueigp.jp/

basic information

For more details, please refer to the PDF document or feel free to contact us.

Price range

Delivery Time

Applications/Examples of results

For more details, please refer to the PDF document or feel free to contact us.

Collection of Iron Product Manufacturing Examples

TECHNICAL

Case Studies for Solving Problems

TECHNICAL

Distributors

Recommended products