ショウエイ 本社 Official site

△▽△【Production Example】Ladder with Backpack △▽△ SUS

Bent pipes are procured from material manufacturers, while materials requiring special processing are sourced from partner vendors!

We would like to introduce a case study of "procurement of processed materials" by our company. Bending pipes are procured from material manufacturers, while materials requiring special processing are sourced from partner vendors. The delivery time is 1.5 months. Please feel free to contact us when you need our services. 【Case Overview】 ■ Material: SUS304TP-A 25A SCH20 ■ Processing Methods - Pipe bending, can manufacturing, welding, and painting - Width 400 × Total length 7,000 ■ Delivery Time: 1.5 months ■ Industries Served: Heavy electrical, industrial equipment related *For more details, please refer to the PDF document or feel free to contact us.

Related Link - http://www.shoueigp.jp/products_sus.html

basic information

For more details, please refer to the PDF document or feel free to contact us.

Price range

Delivery Time

Applications/Examples of results

For more details, please refer to the PDF document or feel free to contact us.

Related Videos

Stainless Steel Product Case Studies

TECHNICAL

News about this product(4)

Recommended products

Distributors