ソシアパーティション (旧 株式会社コマツパーティション) Official site

[Construction Case] Goshogawara Fire Department Training Maze Partition New Construction Project

We will consult, discuss, and propose construction methods that simplify operations and save time and effort in close collaboration with the designers!

We would like to introduce a case study of the Goshogawara Fire Department, which has implemented our sliding wall "Maze Partition." Traditionally, the construction of "exploration training mazes" at various fire departments in Aomori Prefecture required the labor-intensive process of "removing panels from the hardware and reassembling them" every time the maze's assumed patterns were changed. This was too cumbersome, and they sought a solution. As a solution, we proposed our sliding wall, which allows for "panels to be moved freely" without the need for columns to fix the panels in place. This enabled a simplified operation and reduced time and labor for the construction of the "exploration training maze." *For more details, please refer to the PDF document or feel free to contact us.*

Related Link - http://socia-enterprise.co.jp/useful/special.html#…

basic information

【Construction Example】 ■Scale: Sliding wall 92.25 square meters (Panel W900mm × H2050mm 50 sets) ■Construction period: Approximately 3 weeks ■Delivered product: Sliding wall  ・Panel thickness: 50mm  ・Panel surface material: Decorative steel plate  ・Rail: Aluminum rail for 150Kg *For more details, please refer to the PDF document or feel free to contact us.

Price range

Delivery Time

Applications/Examples of results

For more details, please refer to the PDF document or feel free to contact us.

Detailed information

[Construction Example] Goshogawara Fire Station Training Maze Partition New Construction Project

TECHNICAL

CAD data(2)

Model number overview File
SSW(dxf) Movable partition
  • 2D zip ( 2MB)
SSW(dwg) Movable partition
  • 2D zip ( 3MB)

Recommended products

Distributors