Utilize market-linked electricity plans! Proposals for cost reduction from electricity bill reduction simulations.
Reduce electricity costs for factories and facilities! Market-linked plan + DR solutions utilizing storage batteries [Recommended until the end of August 2026].
To combat the rising electricity costs, we propose a solution for reducing electricity bills through the introduction of storage batteries utilizing subsidies and a review of electricity plans. Our company supports the reduction of electricity costs by combining the introduction of storage batteries with a switch to the market-linked plan "Remix Denki DR Menu," utilizing the DR subsidies from the Ministry of Economy, Trade and Industry. By adjusting electricity demand using storage batteries and changing to a power plan linked to market prices, we aim to reduce electricity costs and improve the efficiency of power operations. This solution is particularly recommended for businesses with demand contracts of 200 kW or more, as well as factories and facilities that continue to use electricity after 4 PM. We will support you from the subsidy application to equipment installation, offering energy-saving and cost-reduction measures with minimized initial burdens. 【Estimated Schedule】 ■ By the end of August: Decision on feasibility and application preparation ■ By October 30: Subsidy application (application deadline and review are on a first-come, first-served basis) ■ Approximately 3 to 6 weeks after application: Grant decision ■ After grant decision until late December: Construction and equipment installation ■ February 2 of the following year: Project completion \We offer a simulation example of reductions through the introduction of storage batteries/ For more details, please download the PDF or feel free to contact us.
basic information
【Materials Required for Simulation】 ■ Electricity bills from the power company (12 months) ■ 30-minute demand data (12 months; Excel or CSV format) ■ Single-line wiring diagram ■ Solar power generation data (hourly/12 months; Excel or CSV format) ■ Layout diagram indicating the number of series, etc. *For more details, please download the PDF or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
【Utilization of DR Subsidy Project Reduction Simulation through Battery Installation (Partial)】 ■Industry: Refrigerated and Frozen Warehouse Industry ■Current Power Consumption: 1,865,783 kWh/year, 155,482 kWh/month ■Installed Battery: GROWATT 209 kWh ■Battery Output: 100 kW ■Battery Capacity: 209 kWh *For more details, please download the PDF or feel free to contact us.
catalog(1)
Download All CatalogsRecommended products
Distributors
We are a company that installs and sells residential and industrial solar power generation systems in Hamamatsu City, Shizuoka Prefecture. We operate mainly in Hamamatsu City, the western area of Shizuoka Prefecture, and the Higashi-Mikawa area of Aichi Prefecture. We are confident in our pricing and construction quality☆ Please feel free to consult us about the highly sought-after solar power generation, LED lighting, all-electric systems, storage batteries, and insulation painting!




