[Overhaul Case] Bearing Manufacturer
Production efficiency increased by 10% at about 80% of the cost of new equipment! A case of extending equipment life through overhaul.
We would like to introduce a case where we achieved a 10% increase in production efficiency. We were troubled by a decline in performance efficiency due to aging deterioration, an increase in failure rates, and a worsening of production takt time. In this case, we disassembled the equipment, sorted the parts, and implemented the remanufacturing of unusable parts, modernization of electrical components, and reconstruction of the program, resulting in a recovery to performance levels equal to or greater than those at the time of installation. [Challenges] ■ Decline in performance efficiency and increase in failure rates due to aging deterioration ■ Worsening of production takt time and increase in the number of stoppages *For more details, please download the PDF or feel free to contact us.
basic information
【Overview】 ■Target: Assembly machines, inspection machines, measuring instruments, transport devices, etc. ■Cost: About 80% of the new price *For more details, please download the PDF or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please download the PDF or feel free to contact us.
catalog(1)
Download All CatalogsRecommended products
Distributors
Our company is engaged in the prototyping of industrial machinery and automatic equipment, as well as machine design and manufacturing. We are a company that consistently handles the design to assembly of industrial automation machines that are active in the manufacturing sites of major corporations. With our technical expertise in design, processing, and assembly, we have been in business with our major clients for over 70 years. We respond to various fields with advanced technology and thoroughly pursue our customers' needs. Our factory in Tokyo offers convenient access and flexible support.