[Plant Business] Flue Gas Treatment Tower
Complete inspection in a wide factory with horizontal placement! All sets up to 35m, including accessories, are possible.
At Tokai Techno Co., Ltd., we provide a "smoke treatment tower" that neutralizes and deodorizes exhaust gases from combustion equipment (boilers and incinerators). We can manufacture and assemble heavy and long items using two 20-ton overhead cranes installed in our factory, and we can conduct final inspections horizontally within the factory even for long chimneys with spiral staircases. We have a track record of achieving a verticality of less than 1/100 mm for a total length of 30 meters (20 meters for the main body and 10 meters for the chimney). Please feel free to contact us if you have any inquiries. 【Features】 ■ Up to 35m class ■ Completion confirmation in a wide factory with horizontal placement ■ A verticality of less than 1/100 mm for a total length of 30 meters (20 meters for the main body and 10 meters for the chimney) *For more details, please refer to the related links or feel free to contact us.
basic information
For more details, please refer to the related links or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the related links or feel free to contact us.