バリューイノベーションジャパン Official site

For power plants, scale removal for cooling towers with 'Aqua Crystal Ring'

Solve the cooling tower scale problem at power plants with zero chemicals!

**For Those Struggling with Scale Removal in Cooling Towers** Stubborn scale that cannot be removed even with chemicals, will be completely eliminated with "zero chemicals"! In power plants, the decrease in cooling efficiency due to scale buildup in cooling towers directly leads to a reduction in power generation, resulting in significant losses. Especially in a context where stable power supply is required, abnormal shutdowns of cooling towers can cause planned outages and negatively impact equipment. Aqua Crystal Ring (ACR) contributes to the stable operation of power plants by removing scale without using chemicals and improving cooling efficiency. **Usage Scenarios** - Cooling towers in power plants - Those troubled by decreased cooling efficiency - Those who want to avoid using chemicals **Benefits of Implementation** - Improved cooling efficiency, contributing to increased power generation - Reduced chemical costs and maintenance expenses - Extended equipment lifespan - Reduced environmental impact

[Latest cases published with photos] Official website (Archive Co., Ltd.)

basic information

【Recommended for the following companies】 ✓ Cannot use chemicals due to hygiene or manufacturing reasons ✓ Hesitant to introduce large devices such as "electrolytic scale removal systems" ✓ Prefer minimal maintenance ✓ Previous scale countermeasures have not been effective 【Three features of our product】 ■ Feature 1: Easy installation without construction or tools Installation is as simple as attaching it with the included cable ties. Anyone can easily install it. ■ Feature 2: Can be installed without stopping operation It can be introduced simply by placing it in the water, without needing to stop operations. *In some cases, a temporary shutdown may be necessary. ■ Feature 3: Can be installed regardless of size or type It can be introduced into any cooling tower, regardless of size, shape, or type. 【Specifications】 ・Size: Diameter 100mm, Thickness 30mm ・Material: Plastic (hardened polyethylene) ・Included accessories: Chain, cable ties ・Operating temperature range: 1℃ to 80℃ ・Warranty period: 3 years ▼ For more details (Distributor: Archive Co., Ltd. Official Website) https://acr.archives.co.jp/

Price information

Please send us the specifications of the cooling tower that you are having trouble with, along with any current photos if possible. We will propose the optimal plan and estimate for where and how many units should be installed.

Delivery Time

Please contact us for details

We will deliver within 5 business days after the order is placed. Installation can be done on the same day the product arrives (estimated time: about 10 minutes).

Model number/Brand name

Handling company: Archive Co., Ltd.

Related Videos

Comprehensive brochure "Aqua Crystal Ring (ACR)"

CATALOG

Functions and Effects [Technical Explanation Document]

TECHNICAL

Examples of Water Quality Improvement and Their Mechanisms of Action [Technical Explanation Document Vol. 2]

TECHNICAL

ACR Implementation Case Studies

TECHNICAL

A collection of the latest case studies with surprisingly effective results.

TECHNICAL

Understand with Manga! The New Water Quality Improvement Device 'Aqua Crystal Ring'

OTHER

Explanation of ACR setup method

OTHER

Recommended products

Distributors

Our company, as a member of Japanese society, aims to contribute to the evolution of society by delivering truly valuable products and services to the world through the skill of sales writing. We believe it is our responsibility to possess the skill to accurately and dramatically communicate "the value that the product or service holds." As a result, we believe this will lay the foundation for a hopeful and prosperous society where everyone can live not according to someone else's values, but according to their own values and in their own way.