バリューイノベーションジャパン Official site

Industrial self-consumption solar power generation is an option following NETIS technology.

Simultaneously achieving cost reduction and decarbonization in public works and construction sites: A clear introduction to the benefits of introducing new technologies.

[Our Construction Numbers and Client List] Total construction cost of 908.4 billion yen, with 83 solar power plants built over 12 years. Clients include Sharp, Panasonic, Daiwa House, Nomura Securities, Mitsubishi HC Capital, JA Mitsui Leasing, DMM.com, KKR, Macquarie Capital, Canadian Solar, Trina Solar, J Holdings, RE100 Power, Excelsior Japan, WindSmile, B&M Asset Management, AD Works, Sparks Asset Management, Etrion, and many others. Simultaneously reduce costs and CO₂ without stopping high-precision manufacturing equipment! *For more details, please refer to the related links or feel free to contact us. - Solutions Provided by Solar Power Self-supply on-site electricity with rooftop solar, immediately reducing electricity costs Visualize efforts for SDGs and decarbonization through CO₂ emission reduction Further reduce environmental impact by combining with NETIS technology - Target Subsidy: Ministry of Economy, Trade and Industry "Next Generation Technology Development Demonstration Project Subsidy"

Related Link - https://staging.ked-industrial-power.com/

basic information

**Why Solar Power Generation is Suitable for the Construction Industry** - Reliable and Sustainable Cost Reduction Solar power can cover daytime electricity needs on-site, reducing the need for external power purchases. This also simultaneously achieves a reduction in CO₂ emissions. - High Compatibility with NETIS Technologies Ideal for sites introducing new technologies, such as power supply for temporary offices and charging for electric heavy machinery and EV vehicles. - Zero Initial Costs with Subsidies and PPA Models Utilizing subsidies helps to minimize initial investment. With a PPA, it is possible to implement without any equipment costs.

Price range

Delivery Time

Applications/Examples of results

【Case Study】 - Tokyo Metropolitan Construction Materials Center Installation Capacity: 180kW Annual Electricity Cost Savings: Approximately 4,800,000 yen CO₂ Reduction Effect: Approximately 130 tons per year Comment: "Powering temporary offices and electric tools with solar energy, significantly reducing fuel costs."

Related Videos

Introduction of a self-consumption solar power generation system.

TECHNICAL

【Achievements Introduction 2.0】Over 80 projects in the last 12 years with a total construction cost exceeding 900 billion yen for battery storage and solar power construction!

COMPANY

Recommended products

Distributors

Our company, as a member of Japanese society, aims to contribute to the evolution of society by delivering truly valuable products and services to the world through the skill of sales writing. We believe it is our responsibility to possess the skill to accurately and dramatically communicate "the value that the product or service holds." As a result, we believe this will lay the foundation for a hopeful and prosperous society where everyone can live not according to someone else's values, but according to their own values and in their own way.