Up to 28% reduction in electricity costs with self-consumption solar power generation for the sheet metal and welding manufacturing industry!

Reduce electricity costs and stabilize factory management with self-consumption solar power generation for the sheet metal and welding manufacturing industry. Support for subsidy utilization and a PPA model with zero initial costs is also available.

【List of Our Construction Projects and Clients】 Total construction cost of 908.4 billion yen, with 83 solar power plants built over 12 years. Notable clients include Sharp, Panasonic, Daiwa House, Nomura Securities, Mitsubishi HC Capital, JA Mitsui Leasing, DMM.com, KKR, Macquarie Capital, Canadian Solar, Trina Solar, J Holdings, RE100 Power, Excelsior Japan, WindSmile, B&M Asset Management, AD Works, Sparks Asset Management, Etrion, and many others. Simultaneously reduce costs and CO₂ without stopping high-precision manufacturing equipment! *For more details, please refer to the related links or feel free to contact us. ■ Do you have any of these concerns? Electricity costs for welding, cutting, and pressing machines are soaring. Dust collectors and air conditioning systems are always running, leading to high peak power consumption. Clients are demanding compliance with ESG and SDGs. ■ Comparison Before and After Implementation Before implementation: Welding, pressing, and painting → High electricity costs After implementation: Same processes + self-consumption of daytime power from rooftop solar → Approximately 28% reduction in electricity costs, enhancing corporate value through CO₂ reduction.

Related Link - https://staging.ked-industrial-power.com/

basic information

Feature 1: Mitigating Business Risks by "Fixing" Electricity Costs Minimizing the impact of fuel adjustment costs and renewable energy surcharges to protect profit margins. Feature 2: Optimized for Sheet Metal and Welding Factories Supplementing daytime peak power for high-output welding machines and large presses with solar energy. Feature 3: Utilization of Subsidies & Zero Initial Costs for Implementation Support for subsidies of up to 2/3. With the PPA model, it is possible to start with zero equipment costs.

Price information

[Price and Subsidy] Cost: Individual estimates based on factory roof area and contracted power Subsidy: Up to 2/3 subsidy (utilizing national and local government programs) - Target subsidy: Ministry of Economy, Trade and Industry "Subsidy for Next-Generation Technology Development Demonstration Project"

Delivery Time

Applications/Examples of results

■ Implementation Case: Osaka Prefecture Sheet Metal Processing Factory Implementation Capacity: 180kW (Full utilization of the roof) Annual Electricity Cost Reduction: Approximately 4,800,000 yen Effect: Covers about 50% of daytime power for welding and pressing processes ■ Target Facilities Sheet metal processing, bending, and welding factories Large metal structure manufacturing factories Factories with painting and assembly lines

Related Videos

Introduction of a self-consumption solar power generation system.

TECHNICAL

【Achievements Introduction 2.0】Over 80 projects in the last 12 years with a total construction cost exceeding 900 billion yen for battery storage and solar power construction!

COMPANY

Recommended products

Distributors

Our company, as a member of Japanese society, aims to contribute to the evolution of society by delivering truly valuable products and services to the world through the skill of sales writing. We believe it is our responsibility to possess the skill to accurately and dramatically communicate "the value that the product or service holds." As a result, we believe this will lay the foundation for a hopeful and prosperous society where everyone can live not according to someone else's values, but according to their own values and in their own way.