バリューイノベーションジャパン Official site

Construction of a solar power plant

Many certified electrical engineers are on staff! Leave everything from design to installation and maintenance management to us in one stop.

【Our Construction Projects and Client List】 Total construction cost of 908.4 billion yen, with 83 solar power plants built over 12 years. Notable clients include Sharp, Panasonic, Daiwa House, Nomura Securities, Mitsubishi HC Capital, JA Mitsui Leasing, DMM.com, KKR, Macquarie Capital, Canadian Solar, Trina Solar, J Holdings, RE100 Power, Excelsior Japan, WindSmile, B&M Asset Management, AD Works, Sparks Asset Management, Etrion, and many others. *For more details, please download our catalog or feel free to contact us.* Our company handles "solar power plant construction projects." From the pre-construction phase to construction operations and post-construction maintenance, we provide a one-stop service that streamlines the licensing application and design processes. This allows our clients to focus on their projects with peace of mind. 【Benefits of Consolidated Requests】 ■Consistency and efficiency of the project ■Cost optimization ■Clarification of responsibility *For more details, please refer to the related links or feel free to contact us.*

Related Link - https://ked-industrial-power.com/

basic information

【Flow from Inquiry to Construction】 1. Inquiry 2. On-site investigation and hearing 3. Planning and design proposal 4. Contract and application procedures 5. Construction work 6. Post-construction maintenance services *For more details, please refer to the related links or feel free to contact us. - Target subsidy: Ministry of Economy, Trade and Industry "Subsidy for Next-Generation Technology Development Demonstration Project"

Price range

Delivery Time

Applications/Examples of results

【Achievements (Partial)】 ■ Autobacs Takasago Store - Annual power generation: Approximately 10% of project costs - Maintenance after installation: Patrols, annual inspections, on-site maintenance ■ Silver Life Gunma - Annual power generation: Approximately 11% of project costs - Maintenance after installation: Patrols, annual inspections *For more details, please refer to the related links or feel free to contact us.

Related Videos

The unreasonable cash flow created by the inconvenient truth of solar power generation.

TECHNICAL

Introduction of a self-consumption solar power generation system.

TECHNICAL

【Achievements Introduction 2.0】Over 80 projects in the last 12 years with a total construction cost exceeding 900 billion yen for battery storage and solar power construction!

COMPANY

Recommended products

Distributors

Our company, as a member of Japanese society, aims to contribute to the evolution of society by delivering truly valuable products and services to the world through the skill of sales writing. We believe it is our responsibility to possess the skill to accurately and dramatically communicate "the value that the product or service holds." As a result, we believe this will lay the foundation for a hopeful and prosperous society where everyone can live not according to someone else's values, but according to their own values and in their own way.