バリューイノベーションジャパン Official site

Simultaneously achieve electricity cost reduction and decarbonization! Industrial self-consumption solar power generation on our own roof.

Currently, the number of companies generating renewable energy in-house is increasing. Hokuriku Electric Power and Marubeni New Power have started supplying PPA-type solar power to Toshiba's factory.

[Our Construction Numbers and Client List] Total cumulative construction cost: 908.4 billion yen, with 83 solar power plants built over 12 years. Clients include Sharp, Panasonic, Daiwa House, Nomura Securities, Mitsubishi HC Capital, JA Mitsui Leasing, DMM.com, KKR, Macquarie Capital, Canadian Solar, Trina Solar, J Holdings, RE100 Power, Excelsior Japan, WindSmile, B&M Asset Management, AD Works, Sparks Asset Management, Etrion, and many others. Reducing costs and CO₂ simultaneously without stopping high-precision manufacturing equipment! *For more details, please download the catalog or feel free to contact us.* [Don't Make Mistakes! Key Points for Choosing a Reliable Solar Power Construction Contractor] Catalog available! Efforts by companies to reduce electricity costs and CO₂ emissions are accelerating nationwide. We provide a system for "self-consumption solar power generation" installed on our own roofs, which can be implemented with zero initial costs (on-site PPA).

Related Link - https://staging.ked-industrial-power.com/

basic information

Why Solar Power for Industrial Self-Consumption Now?" In June 2025, Hokuriku Electric Power and Marubeni New Power will begin supplying 24MW of solar power (off-site PPA) to Kaga Toshiba Electronics. As a result, it will be possible to reduce approximately 13,000 tons of CO₂ annually (equivalent to about 5,000 households). This type of "PPA-based solar introduction" is rapidly spreading in the manufacturing, logistics, and construction industries. - Target Subsidy: Ministry of Economy, Trade and Industry "Next-Generation Technology Development Demonstration Project Subsidy

Price range

Delivery Time

Applications/Examples of results

【Case Study】 ■ Metal Processing Factory in the Tokai Region Installation Capacity: 180kW Annual Electricity Cost Savings: Approximately 4,500,000 yen CO₂ Reduction: Approximately 130 tons/year Installation Model: PPA Plan with Zero Initial Cost (15-year contract)

Related Videos

【Achievements Introduction 2.0】Over 80 projects in the last 12 years with a total construction cost exceeding 900 billion yen for battery storage and solar power construction!

COMPANY

The unreasonable cash flow created by the inconvenient truth of solar power generation.

TECHNICAL

No failures! Key points for choosing a reliable solar power construction contractor.

TECHNICAL

Recommended products

Distributors

Our company, as a member of Japanese society, aims to contribute to the evolution of society by delivering truly valuable products and services to the world through the skill of sales writing. We believe it is our responsibility to possess the skill to accurately and dramatically communicate "the value that the product or service holds." As a result, we believe this will lay the foundation for a hopeful and prosperous society where everyone can live not according to someone else's values, but according to their own values and in their own way.