バリューイノベーションジャパン Official site

Energy-saving reforms in logistics sites start with industrial self-consumption solar power.

Simultaneously achieve reductions in electricity costs and CO2 emissions, covering the power for material handling equipment and transport vehicles with self-generated electricity.

【Our Construction Numbers and Client List】 Total accumulated construction cost of 908.4 billion yen, with 83 solar power plants built over 12 years. Numerous transaction records with Sharp, Panasonic, Daiwa House, Nomura Securities, Mitsubishi HC Capital, JA Mitsui Leasing, DMM.com, KKR, Macquarie Capital, Canadian Solar, Trina Solar, J Holdings, RE100 Power, Excelsior Japan, WindSmile, B&M Asset Management, AD Works, Sparks Asset Management, Etrion, and many others. Simultaneously reduce costs and CO₂ without stopping high-precision manufacturing equipment! 【Don't Fail! Key Points for Choosing a Reliable Solar Power Construction Contractor】Catalog available now! 【Challenges in the Logistics Sector and Solar Solutions】 - Challenges faced by the logistics industry Massive power consumption from material handling equipment, air conditioning, and lighting Rising electricity costs are putting pressure on management Urgent need for ESG and decarbonization measures Increased power demand due to the spread of electric forklifts and automated guided vehicles (AGVs) - Solutions provided by solar power Visualizing CO2 emissions to enhance corporate environmental value Possibility of zero initial investment through subsidies and PPA models

Related Link - https://staging.ked-industrial-power.com/

basic information

Why Solar Power Generation is Optimal for the Logistics Industry" - Reliable and Sustainable Cost Reduction Utilizing rooftop solar power to cover daytime electricity needs, simultaneously reducing electricity costs and CO2 emissions. - High Compatibility with Electrification Equipment Covering the power needs of charging equipment for forklifts and AGVs with solar power, contributing to fuel cost reduction. - Zero Initial Costs with Subsidies and PPA Models Utilizing subsidies from the national and local governments. With a PPA, it is possible to implement without any equipment costs. - Targeted Subsidy: Ministry of Economy, Trade and Industry "Subsidy for Next-Generation Technology Development Demonstration Project

Price range

Delivery Time

Applications/Examples of results

【Case Study】 - Chiba Prefecture Large Logistics Center Installation Capacity: 250kW Annual Electricity Cost Reduction: Approximately 7,000,000 yen CO2 Reduction Effect: Approximately 180 tons per year Comment: "Covers about 40% of the operating power of material handling equipment, significantly reducing electricity costs."

Introduction of a self-consumption solar power generation system.

TECHNICAL

【Achievements Introduction 2.0】Over 80 projects in the last 12 years with a total construction cost exceeding 900 billion yen for battery storage and solar power construction!

COMPANY

No failures! Key points for choosing a reliable solar power construction contractor.

TECHNICAL

Recommended products

Distributors

Our company, as a member of Japanese society, aims to contribute to the evolution of society by delivering truly valuable products and services to the world through the skill of sales writing. We believe it is our responsibility to possess the skill to accurately and dramatically communicate "the value that the product or service holds." As a result, we believe this will lay the foundation for a hopeful and prosperous society where everyone can live not according to someone else's values, but according to their own values and in their own way.