28% cost reduction in fixed expenses for food processing factories with rooftop solar.
Reduce "factory fixed costs" with rooftop solar! ▶ It's possible to have zero initial costs by utilizing subsidies!
【Our Construction Numbers and Client List】 A total construction cost of 908.4 billion yen, with 83 solar power plants built over 12 years. Clients include Sharp, Panasonic, Daiwa House, Nomura Securities, Mitsubishi HC Capital, JA Mitsui Leasing, DMM.com, KKR, Macquarie Capital, Canadian Solar, Trina Solar, J Holdings, RE100 Power, Excelsior Japan, WindSmile, B&M Asset Management, AD Works, Sparks Asset Management, Etrion, and many others. Reduce costs and CO₂ simultaneously without stopping high-precision manufacturing equipment! 【Don't make mistakes! Points for choosing a reliable solar power construction contractor】Catalog available now! 【Significant cost reduction for refrigeration and freezing equipment.】 〇 Issues with the traditional cost structure Rising electricity prices year after year Fluctuation risks of fuel adjustment costs and renewable energy surcharges High-cost contracts for peak high-voltage electricity in summer 〇 Changes after implementation Reduce electricity costs by up to 28% through self-generated power from solar energy. *For more details, please download the catalog or feel free to contact us.
basic information
【Introduction of Features and Functions】 Feature 1: Power Generation Design Specialized for Food Factories Designed for output to match high operating rate equipment such as freezers and refrigerators, achieving maximum self-consumption. Feature 2: Support for Subsidies & PPA Models Compatible with both self-owned and zero initial cost PPA models. Also eligible for Tokyo Metropolitan Government and Ministry of Economy, Trade and Industry subsidies, with up to 50% installation assistance possible. Feature 3: Experienced Construction and Maintenance System in the Industry Installation schedules that do not interfere with factory operations, with comprehensive maintenance support from certified electrical engineers.
Price information
[Price, Subsidies, Delivery Time] Implementation Cost: Individual estimate based on scale Subsidy: Up to 1/2 subsidy (by national and prefectural governments) Estimated Delivery Time: Operational within 2 months at the earliest from consultation PPA plan available with zero initial costs - Target Subsidy: Ministry of Economy, Trade and Industry "Next Generation Technology Construction Demonstration Project Subsidy"
Delivery Time
Applications/Examples of results
【Case Studies】 Chiba Prefecture Frozen Food Factory: Annual electricity cost reduced by 3,477,711 yen Shizuoka Prefecture Confectionery Factory: Achieved self-consumption rate of over 60% 【Usage Examples】 Utilized for base power of rapid freezers and large refrigerators. Utilized for daytime packing and shipping line power.
Related Videos
catalog(3)
Download All Catalogs
Recommended products
Distributors
Our company, as a member of Japanese society, aims to contribute to the evolution of society by delivering truly valuable products and services to the world through the skill of sales writing. We believe it is our responsibility to possess the skill to accurately and dramatically communicate "the value that the product or service holds." As a result, we believe this will lay the foundation for a hopeful and prosperous society where everyone can live not according to someone else's values, but according to their own values and in their own way.