ビジュアル・コンポネンツ・ジャパン (Visual Components) 東京支店 Official site

[Visual Components Case Study] Addressing the Shortage of Welders

Optimization of robot offline teaching workflows to enhance production efficiency!

We would like to introduce a case study of the implementation of "Visual Components OLP" at AMI Attachments, a manufacturer of heavy machinery attachments. The company faced the challenge of improving production efficiency while responding to changing market demands, as well as a shortage of welding technicians. By implementing this product, they were able to reduce teaching time by 70%, achieving improvements in both production efficiency and quality. [Case Overview] ■ Challenge: In low-volume, high-variety production, manual robot teaching is time-consuming and prone to errors. ■ Results - A customized training program enabled them to maximize the use of the product. - Remote and on-site calibration minimized downtime, allowing for smooth operations and accurate robot setup. *For more details, please download the PDF or feel free to contact us.

Related Link - https://www.visualcomponents.com/jp/case-studies/c…

basic information

For more details, please download the PDF or feel free to contact us.

Price range

Delivery Time

Applications/Examples of results

For more details, please download the PDF or feel free to contact us.

[Data] Layout Planning and Optimization by Visual Components

OTHER

Simulation and Offline Teaching (OLP) Software for Robots [Visual Components Oy]

PRODUCT

[Data] Efforts to Address Skill Shortages in the Manufacturing Industry Using Simulation Software and Robot Offline Teaching

TECHNICAL

News about this product(2)

Recommended products

Distributors