news list
1~11 item / All 11 items
-
[Case Study Vol. 10] A large amount of scale attached to the louver was removed.
■Consultation Details: There was a consultation regarding issues with scale adhesion. ■Equipment: Small cooling tower ■Location: Tokyo, Japan ■Industry: Automotive parts factory ■Result: We have introduced this with photos on our company website below. *Please click on the "Related Links" below to view.
-
[Case Study Vol. 9] The scale accumulated over a year and a half has dropped.
■Consultation Details: We received a request for scale removal from a round cooling tower that has been in operation for a year and a half since its installation. We have earned trust in ACR as it has been installed in other equipment as well. ■Equipment: Small Cooling Tower ■Location: Ome, Tokyo ■Industry: Automotive Parts Factory ■Results: We have introduced this with photos on our company website below. *Please click on the "Related Links" below to view.
-
[Case Study Vol. 8] The rust on the cooling tower has stopped.
■Consultation Details: There was a consultation regarding rust observed on the cooling tower, and they would like to stop the rust. ■Equipment: Small cooling tower ■Location: Osaka Prefecture ■Industry: Metal factory ■Result: We have introduced it with photos on our website below. *Please click on the "Related Links" below to view.
-
[Case Study Vol. 7] Years of accumulated scale has completely peeled off.
■Consultation Details: The inquiry was about concerns regarding maintenance without the use of chemicals, as chemicals have been used in the cooling tower up to now, and whether it would be problematic to switch to a maintenance method that does not use chemicals. ■Equipment: Small Cooling Tower ■Location: Ome, Tokyo ■Industry: Automotive Parts Factory ■Result: We have introduced this with photos on our website below. *Please click on the "Related Links" below to view.
-
[Case Study Vol. 6] Scale that was stuck in the filler material has peeled off.
■Consultation Details: A scale blockage has occurred in the fill material of the cooling tower, causing water to overflow. The consultation was regarding the desire to clean the inside of the fill material. ■Equipment: Medium-sized cooling tower ■Location: Tokyo, Japan ■Industry: Manufacturing factory ■Result: We have introduced this with photos on our website linked below. *Please click on the "Related Links" below to view.
-
[Case Study Vol. 5] Thanks to ACR, we were able to avoid replacing the cooling tower.
■Consultation Details: Due to the accumulation of scale over many years, the clogging of the fill material in the cooling tower could not be resolved, and replacement of the cooling tower was suggested. However, since the replacement work would require a long period and incur high costs, we were exploring other solutions. ■Equipment: Large Cooling Tower ■Location: Tokyo, Japan ■Industry: Accommodation Facility ■Result: We have introduced this with photos on our website below. *Please click on the "Related Links" below to view.
-
[Case Study Vol. 4] Successfully removed scale that was not visible from the outside.
■Consultation Details: We received a consultation regarding an issue where a high-pressure compressor has stopped, and scale removal is necessary. Specifically, scale has accumulated in the filter, causing overheating, which led to the shutdown. ■Company Name: BUSHU KOGYO Co., Ltd. ■Equipment: Small Cooling Tower ■Location: Ome, Tokyo ■Industry: Automotive Parts Factory ■Result: We have introduced this with photos on our company website below. *Please click on the "Related Links" below to view.
-
[Case Study Vol. 3] Years of accumulated scale has completely peeled off.
■Consultation Details: At the exhibition, we received an inquiry from Bushu Industries, which is addressing environmental issues, about whether there is a method for scale removal management of cooling towers that does not use chemicals. ■Company Name: Bushu Industries Co., Ltd. ■Equipment: Small Cooling Tower ■Location: Ome, Tokyo ■Industry: Automotive Parts Factory ■Results: We have introduced this with photos on our website linked below. *Please click on the "Related Links" below to view.
-
[Case Study Vol. 2] Completely removing a 10kg scale
■Consultation Details: There were restrictions on cleaning and maintenance while stopping the cooling tower at a factory that operates 24/7, and there was a consultation regarding the significant scale buildup. ■Equipment: Medium-sized cooling tower ■Location: Tokyo, Japan ■Industry: Manufacturing factory ■Result: We have introduced this with photos on our website below. *Please click on the "Related Links" below to view.
-
[Case Study Vol. 1] Massive scale cleared in just 2 months!
■Consultation Details: We received a consultation regarding an issue where a high-pressure compressor has stopped, and scale removal is necessary. Specifically, scale has accumulated in the filter, causing overheating, which led to the stoppage. ■Equipment: Round Cooling Tower ■Location: Tokyo, Japan ■Industry: IC Chip Manufacturing Company ■Result: We have introduced this with photos on our company website below. *Please click on the "Related Links" below to view.
-
Is there anyone else who wants to try a scale removal method that completely removes the scale from the cooling tower?
"To those in charge who are struggling with scale buildup in cooling towers" Is there anyone else who would like to try a scale removal method that makes stubborn scale, which cannot be removed even with chemicals, "peel off completely"? We have prepared a special page, so please check it out now from the "Related Links" below.