For scale removal in cooling towers, use "Aqua Crystal Ring."
Completely removed with no reattachment. That's why maintenance is easy, and labor-saving can be achieved. No more worrying about scale.
**For those troubled by scale removal in cooling towers** Stubborn scale that won't come off even with chemicals, will be completely removed with "zero chemicals"! **All these concerns can be resolved!** ✓ The scale is severe. ✓ Cooling efficiency is declining, and there are instances of abnormal shutdowns. ✓ Fillers are clogged with scale. ✓ It’s hard to remove even with chemicals. ✓ Maintenance effort and frequency are increasing. ✓ I want to reduce chemical costs. **Five benefits of choosing us** ■ Benefit 1: Significantly improved cooling efficiency! Scale removal restores the original cooling performance. ■ Benefit 2: No chemicals, power supply, or construction needed! Just place it in water. No special work is required. ■ Benefit 3: Maintenance-free Simply wipe the main unit with a cloth when it gets dirty. Maintenance is completed in one minute! ■ Benefit 4: Reduced running costs No need for chemicals, electricity, or additional maintenance costs. Significantly cut expenses. ■ Benefit 5: Environmentally friendly Contributes to reducing waste and CO2 emissions with zero chemicals and power supply. ★ Moreover, to prevent the reattachment of scale, the lifespan of the equipment and piping inside the cooling tower is greatly extended.
basic information
【Recommended for companies like these】 ✓ Cannot use chemicals due to hygiene or manufacturing reasons ✓ Hesitant to introduce large devices such as "electrolytic scale removal devices" ✓ Prefer minimal maintenance ✓ Previous scale countermeasures have not been effective 【Three features of our product】 ■ Feature 1: Easy installation without construction or tools Installation is as simple as attaching it with the included insulock. Anyone can easily install it. ■ Feature 2: Can be installed without stopping operation It can be introduced simply by placing it in water, without needing to stop operations. *In some cases, stopping operation may be necessary. ■ Feature 3: Can be installed regardless of size or type It can be introduced into various cooling towers, regardless of size, shape, or type. 【Specifications】 - Size: Diameter 100mm, Thickness 30mm - Material: Resin (hardened polyethylene) - Accessories: Chain, zip ties - Operating temperature range: 1℃ to 80℃ - Warranty period: 3 years For information on the safety of our product (Product Safety Data Sheet/SDS), please visit our company website below. https://acr.archives.co.jp/specification/
Price information
Please send us the specifications of the cooling tower you are having trouble with, along with any current photos if possible. We will propose the optimal plan and estimate for where and how many units should be installed.
Delivery Time
Model number/Brand name
Aqua Crystal Ring (abbreviated as ACR) that completely removes scale without chemicals.
Applications/Examples of results
■Example 1: A major hotel in Tokyo - Cooling tower for air conditioning (1800RT) A large cooling tower that has been in operation for 25 years. The cooling efficiency had significantly declined due to scale and rust, and they were considering replacing the cooling tower. Including disposal, new installation, piping work, and losses due to downtime, the estimated cost was about 200 million yen. They decided, "It's not too late to try this product first," and installed it. As a result, scale removal and rust suppression were achieved, leading to an extension of the cooling tower's lifespan and significant cost savings. (Afterward, it was also installed in related hotels such as Hakone and Ito.) ■Example 2: A major ice manufacturing company in Saitama - Cooling tower (125RT) A cooling tower that had been in operation for 18 years. A significant amount of scale had adhered to the filler, leading to a deterioration in cooling efficiency. They were troubled as the scale could not be removed even with chemical treatment. About 10 months after installation, approximately 20 kg of scale detached, and cooling efficiency was restored. (Afterward, it was also installed in another cooling tower.) ★In addition, we have a cumulative record of over 100 installations, regardless of size (large, medium, or small). We provide detailed introductions with photos in our 'Case Study Collection,' so please download it now and check its effectiveness.
Related Videos
catalog(7)
Download All Catalogs
News about this product(2)
-
Is there anyone else who wants to conduct a water quality test for free? [Limited to the first 5 companies]
【To companies with cooling towers】 Can your cooling tower really get through this summer without any troubles? If you have even a little anxiety... Why not have a "health check" for your cooling tower? We will conduct a water quality test for free, limited to the first 5 companies! =========== Finally, the summer season when cooling towers are at their peak operation is approaching. This time of year marks the beginning of the season when cooling equipment faces the most load. And every year at this timing, we receive numerous inquiries from companies nationwide, such as: "The cooling efficiency has decreased, and cooling shortages are occurring." "The pump has stopped urgently due to cooling abnormalities." "The pipes are clogged with scale, reducing the supply water volume." We receive many inquiries regarding troubles caused by cooling shortages. So, why do cooling troubles occur in the first place? For more details, please visit the special page below. ↓↓↓ https://lp.archives.co.jp/inspection
-
Is there anyone else who wants to try a scale removal method that completely removes the scale from the cooling tower?
"To those in charge who are struggling with scale buildup in cooling towers" Is there anyone else who would like to try a scale removal method that makes stubborn scale, which cannot be removed even with chemicals, "peel off completely"? We have prepared a special page, so please check it out now from the "Related Links" below.