Case Study: New Listing - South Korea's SK E&C Reduces Engineering and Estimation Man-Hours by 50% Using Aspen Capital Cost Estimator

アスペンテックジャパン/AspenTech

アスペンテックジャパン/AspenTech

The international competition for bids and estimates in plant construction projects is fierce, and SK E&C needed technology and workflow processes that would enable them to compete against rival companies with lower labor costs. Therefore, SK E&C adopted the Aspen Capital Cost Estimator (ACCE) as an integrated cost estimation tool. They defined a systematic workflow to execute projects in a planned manner and created bids in a systematic way. "The owner-operator was faced with the decision of whether to construct a large oil refining facility in Thailand. With the Aspen Capital Cost Estimator, the owner-operator was able to obtain reliable and verifiable budget estimates, allowing SK E&C to execute project cost estimation more easily and flexibly," said Jaeyong Kim, Senior Cost Estimator for Plant Projects at SK E&C. For more details, please refer to the related catalog titled "Korea's SK E&C Reduces Engineering and Estimation Man-Hours by 50% with Aspen Capital Cost Estimator."

Related catalog

South Korea's SK E&C reduces engineering and estimation man-hours by 50% using Aspen Capital Cost Estimator.

TECHNICAL