藤川伝導機 Official site

[Performance Introduction] Process Building and Packaging Building Blowers

We will introduce a case where a field survey was conducted to check the condition of the blower and the surrounding environment!

We received a consultation from an existing customer in the chemical industry regarding a blower that draws in air for factory air conditioning, which was experiencing vibrations during operation. Upon checking the situation, it was necessary to perform dynamic balancing adjustments of the impeller on-site in conjunction with the replacement of bearing components. Therefore, we proposed bearing replacement work and on-site adjustments along with the report of the on-site investigation. Due to the impact of the construction schedule, we could only secure a five-day timeframe for the work. Although it was a tight schedule for parts replacement and adjustments, we had conducted a preliminary on-site investigation and checked the surrounding environment, allowing us to plan a smooth construction process without waste. We successfully completed the parts replacement and adjustments within the timeframe. [Case Summary] ■ Issue: Unusual noise and vibrations occurring during operation of the blower that draws in air for factory air conditioning. ■ Effect: Elimination of unusual noise and vibrations, ensuring the air intake volume. *For more details, please download the PDF or feel free to contact us.

Related Link - https://fd-engineering-service.com/

basic information

【Other Case Overview】 ■Industry: Chemical ■Service: Repair and Maintenance ■Equipment: Blower ■Region: Kanto *For more details, please download the PDF or feel free to contact us.

Price range

Delivery Time

Applications/Examples of results

For more details, please download the PDF or feel free to contact us.

Delivery Performance_ Process Building and Packaging Building Blower _ FD Engineering Services

TECHNICAL

Distributors

Recommended products