[Achievements] Snake Conveyor Tension Adjustment
Introducing a case where the cause of abnormal noise was discovered and pointed out, along with improvement suggestions!
last updated
-
[Performance Introduction] Selection and Installation of Vinyl Curtains
We will introduce a case where measures were implemented by hanging a sheet in an L-shape to address the gap at the corner!
last updated
-
[Achievements Introduction] XYZ Equipment Design and Manufacturing
We will introduce a case where we proposed the production of equipment using IKO, which has a strong connection with our company, based on the hearing content!
last updated
-
[Project Introduction] Installation Work of Sakae Manufacturing Products Shelves
We will introduce examples of proposals made by two companies, Sakae and Logic Steel, as manufacturers that meet your requests!
last updated
-
[Achievement Introduction] Plastic Box Welding Device
We would like to introduce a case where we were able to deliver equipment with appropriate specifications and a welding device that excels in QCD.
last updated
-
[Achievement Introduction] Switching from fluorescent lights to LED lighting
Response to the 2027 Problem! A case study of energy conservation, power saving, and environmental improvement achieved at a logistics center after 10 years.
last updated
-
Introduction to Engineering Services for Factory Management: Case Studies
Aging factory equipment and troubles, here's how we solved them!
last updated
-
[Performance Introduction] Predictive Maintenance System AE Sensor Monitoring Predictive Maintenance System Implementation
A case of visualizing the metal fatigue of the main shaft to prevent sudden line stoppages.
last updated
-
[Achievements Introduction] Scientific Instruments Conveying Equipment
An example of delivering a robot, which usually has a delivery time of 3 months, in 1 month and manufacturing the equipment.
last updated
-
[Project Introduction] Hydraulic Unit Renewal Work
A case where sorting was done appropriately for each task, resulting in smooth and speedy responses.
last updated
-
[Performance Introduction] Blower Replacement Work
We will introduce a case where a total of 10 renovation projects were carried out, taking budget cuts into consideration.
last updated
-
[Achievements Introduction] Toyo Shutter Maintenance
Examples of proposing and responding to speedy and appropriate construction through close collaboration with manufacturers.
last updated
-
[Achievements] Selection and Modification of NTN Parts Feeders
A case of manufacturing a parts feeder in collaboration with a specialized technical team.
last updated
-
[Performance Introduction] Hydraulic Unit Replacement and Modification Work
Introducing a case of construction work for pump peripheral equipment and tank interior cleaning.
last updated
-
[Project Introduction] Modification Work for Hitachi Inkjet Printers
Introducing a case where existing machinery was modified to accommodate water-soluble ink.
last updated
-
[Performance Introduction] Air Conditioning and Refrigeration Equipment Renewal Work
Introducing examples of schedules that can be implemented in a short period of time!
last updated
-
[Project Introduction] Installation of an elevator for transporting construction materials due to the establishment of a new building at the manufacturing factory.
We will present the flow leading up to the installation work and proceed with the proposal, showcasing examples of cases where we have secured construction jobs!
last updated
-
[Performance Introduction] Case Study of Slat Conveyor Type Tempering Furnace Manufacturing
We would like to introduce a case where we proposed collaboration by requesting the manufacturer to select partial mechanical equipment, while the customer's design team incorporates everything into the drawings.
last updated
-
[Case Study] Press Machine Safety Measures - Komori Safety Machine Research Institute Implementation Example
Introducing a case where a laser-type safety device (Komori Safety Research Institute, Model: DSP-J) was proposed!
last updated
-
[Performance Introduction] Robot-type Sheet Cutting Device
We would like to introduce a case where we delivered a cutting machine for resin sheets to a chemical manufacturer with whom we have had a long-standing business relationship!
last updated
-
[Project Showcase] Heat-Insulating Coating Work
We will introduce a case where we proposed painting work with heat-insulating paint as a measure to reduce electricity costs and improve the working environment!
last updated
-
[Performance Introduction] Process Building and Packaging Building Blowers
We will introduce a case where a field survey was conducted to check the condition of the blower and the surrounding environment!
last updated
-
[Achievements] Hydraulic Device for Mobile Piers and Protector Device
I would like to introduce a repeat project for the installation of hydraulic equipment from an existing customer!
last updated
-
[Achievements Introduction] Renewal of Ejector Pin Inner Diameter Processing Machine
We will introduce a case of a renewal proposal for control equipment from Fuji Electric to Mitsubishi Electric!
last updated
-
[Achievements] Selection of partner companies for automotive parts production.
We will introduce a case where we selected a suitable partner company based on the customer's request!
last updated
-
[Performance Introduction] Resin Conveyor Belt Replacement Work
Due to our extensive experience with resin belts and other conveying equipment, we can also respond to unexpected inquiries!
last updated
-
[Project Introduction] Exhaust Fan Replacement Project for Food Manufacturing Factory
We will introduce a case where a construction schedule was created after receiving an order, leading to smooth construction execution!
last updated
-
[Achievements Introduction] Automotive Resin Parts Crimping Device
Although it was a tight deadline project, we would like to introduce a case where we proactively implemented proposals ahead of schedule, exceeding the client's requested deadline!
last updated
-
[Project Introduction] Replacement Work from Mercury Lamps to LED
We will introduce a case where we proposed Mitsubishi Electric's high-ceiling LED, explained product features, and submitted various documents and data!
last updated
-
[Performance Introduction] Conveyor Replacement Work for Food Factories
We will introduce a case where we proposed to undertake everything from selection, delivery, to construction, and successfully secured the order!