[Performance Introduction] Air Conditioning and Refrigeration Equipment Renewal Work
Introducing examples of schedules that can be implemented in a short period of time!
We received a request from a customer in the food industry to consider updating 25 air conditioning and refrigeration units. Given the limited construction period and the need for cost reduction, we proposed a schedule that allows for short-term construction while taking into account the timing of crane usage and the overall construction schedule. By sourcing the equipment ourselves and entrusting the construction coordination to Tsukamoto Air Conditioning Equipment, we achieved cost savings. 【Case Overview】 ■Industry: Food ■Service: Repair and Maintenance ■Target Equipment: Air Conditioning and Refrigeration Units ■Region: Chubu *For more details, please download the PDF or feel free to contact us.
basic information
**Points for Cost Reduction and Shortening Construction Periods** - Achieved cost reduction by sourcing equipment in-house and entrusting construction coordination to Tsukamoto Air Conditioning Equipment. - Reduced costs by directly dealing with a new sock duct manufacturer to minimize indirect margins. - To shorten the construction schedule, we carried out indoor and outdoor work simultaneously with 3-4 teams while paying attention to various factors as the main contractor. *For more details, please download the PDF or feel free to contact us.*
Price range
Delivery Time
Applications/Examples of results
For more details, please download the PDF or feel free to contact us.