冨士精工 Official site

The prototype is ready, but mass production can't be done!? Key points to avoid failure during the transition to mass production.

The importance of identifying mass production issues during the prototype phase.

Even if the prototype is completed without issues, challenges such as quality defects, increased costs, and insufficient production capacity may arise when starting mass production. Therefore, it is important to confirm during the prototyping stage whether it can be produced stably during mass production, whether the target cost can be achieved, and whether it is easy to assemble. At Fuji Seiko, we leverage our strength of being able to handle everything from molding to assembly, allowing us to identify and propose improvements for mass production challenges early on from the prototyping stage. If you have concerns such as: ☑ A prototype was completed, but defects occurred during mass production ☑ Mass production costs more than expected ☑ Issues were discovered in the assembly process after molding please consult with Fuji Seiko.

basic information

Please contact us.

Price range

Delivery Time

Applications/Examples of results

Please contact us.

Recommended products

Distributors

Fujiseiko Co., Ltd. is a company that continues to propose and provide "manufacturing and services from the customer's perspective." We will do our utmost to respond to "the QCD that our customers desire" by collaborating with our affiliated companies and partner companies, in addition to our own processing capabilities. Please feel free to consult with us first.