広商NEXUS Official site

[Case Study] Comprehensive management of equipment relocation work reduces management man-hours and costs!

Since we have a license for machinery and equipment installation, we can also handle large-scale projects!

We would like to introduce a case where we took on the complex task of relocating equipment as a single order and managed it entirely. We received a consultation from a customer group that needed to move equipment between factories to consolidate their production lines, but they could not allocate time for construction management and schedule management. By implementing our proposal for comprehensive management of the equipment relocation project, we were able to streamline communication and trouble resolution, as the point of contact was consolidated from consultation to project completion. [Challenges] ■ We want to smoothly relocate and start up production equipment within the designated timeframe. ■ Cost reduction. ■ We want to simplify the management of various contractors and processes. *For more details, please refer to the related links or feel free to contact us.

Related Link - https://hirosho.com/works/p374/

basic information

【Effect】 ■ Since the contact point is consolidated from consultation to completion of construction, smooth meetings and trouble resolution are possible. ■ By placing a bulk order, unnecessary intermediate management is eliminated, leading to overall cost reduction. ■ Ensures the same product processing quality as before relocation. *For more details, please refer to the related links or feel free to contact us.

Price range

Delivery Time

Applications/Examples of results

For more details, please refer to the related links or feel free to contact us.

catalog(12)

Download All Catalogs

Hirosho NEXUS Co., Ltd. Company Profile

COMPANY

[Case Study Material] Installation of Electronic Display Linked to the Condition of Transport Cart

TECHNICAL

[Case Study Material] Installation of Pedestrian-Vehicle Separation Safety Barriers

TECHNICAL

[Case Study Material] Reduction of Storage Space for Work Transport Carts

TECHNICAL

[Case Study Material] Efficiency Improvement of Product Storage Space through the Installation of Roller Conveyors

TECHNICAL

[Case Study Material] Clean Room Expansion

TECHNICAL

[Case Study Material] Design and Implementation of Automatic Forming Machines

TECHNICAL

[Case Study Material] Installation of Cleaning Brushes for Transport Pallets on Existing Equipment

TECHNICAL

[Case Study Material] Comprehensive Management of Equipment Relocation Work

TECHNICAL

[Case Study Material] [Energy Saving] Reducing Heat Dissipation and Cutting Costs!

TECHNICAL

[Case Study Material] Easy IoT Implementation for Improved Operating Rate

TECHNICAL

[Case Study Document] Designed and Improved the Oil Supply Port of Processing Equipment

TECHNICAL

Recommended products

Distributors