Case Study: [Improvement of Production Efficiency]
Case Study: [Improvement of Production Efficiency]
Introducing case studies of solutions.
1~19 item / All 19 items
-
[Case Study] Comprehensive management of equipment relocation work reduces management man-hours and costs!
Since we have a license for machinery and equipment installation, we can also handle large-scale projects!
last updated
-
[Case Study] Outsourcing unit jigs reduces management man-hours and costs!
A case where a system was established to continuously supply unit jigs of the same quality as the customer's in-house products!
last updated
-
[Case Study] Measures against pallet wear during transport and elimination of foreign matter attachment through assembly!
A case where we proposed several types of materials that match the customer's preferences and created comparison materials for each type.
last updated
-
[Case Study] Extension of Diamond Dresser Lifespan
A case where a highly specialized improvement approach was implemented as an official distributor of a grinding wheel manufacturer!
last updated
-
[Case Study] Expansion of Clean Room
Expansion without moving existing rooms! A case where securing temporary storage space was unnecessary.
last updated
-
[Case Study] Improvement of Production Efficiency by Eliminating Chocolate Stops Caused by Brush Engagement
The biting issue has been resolved, and the exchange interval has been extended! This has led to cost reduction and an improvement in the installation rate.
last updated
-
[Case Study] Achieving Space Saving and 5S Measures in the Factory with Original Carts
Proposal for the production of a collapsible cart! A case where storage lanes were installed in various locations to standardize storage spaces.
last updated
-
[Case Study] Labor-saving through the design and implementation of an automatic forming machine
Introducing examples of FA (Factory Automation) that have inherited traditional and good old techniques into machinery!
last updated
-
[Case Study] Designed the oil supply port for processing equipment to improve work efficiency and production efficiency.
A case where we handled everything from on-site measurements to the design, manufacturing, and installation of a new fuel inlet!
last updated
-
[Case Study] Extension of transport pallet lifespan and reduction of replacement costs!
On-site exchange possible with zero lead time! A case of cost reduction through pinpoint exchange method.
last updated
-
[Case Study] Reduced Tool Costs by Extending Lifespan through Improved Drill Welding!
A case where we quickly proposed a new cutting edge shape along with the analysis results of the current situation, contributing to a reduction in tool costs!
last updated
-
[Case Study] Significant reduction in man-hours through the development of a special flange that allows simultaneous use of multiple grinding stones.
A case where we achieved significant results through the proposal of a new concept flange!
last updated
-
[Case Study] Elimination of Molded Grinding Stones for Diamond Dressers
A case where the grinding process was reduced and the number of dressings was shortened, leading to a reduction in tool costs!
last updated
-
[Case Study] Improved Production Efficiency through Two-Layer Structure of Chuck Clamps with Rubber Lining
We will introduce examples where our ideas and design capabilities have made it easier to understand the condition of parts management!
last updated
-
[Case Study] Proposal for Reusing Chucks through Laser Cladding Welding
Introducing a case where a fourfold increase in lifespan was achieved, resulting in reduced replacement labor and improved operational efficiency.
last updated
-
[Case Study] Improved Work Efficiency through the Centralization of Transport Pallets!
We will introduce a case where the procurement man-hours were reduced by creating drawings from the actual items!
last updated
-
[Case Study] Installation of Automatic Cleaning Brushes for Transport Pallets on Existing Equipment
A case where the automation of cleaning transport pallets improved work efficiency and reduced labor costs.
last updated
-
[Attention Equipment Manufacturers!] Comprehensive contracting for high-difficulty jigs and unit products!
Quality assurance through high-level in-house inspections! Comprehensive support from drawing to quality inspection for processed procurement parts and sheet metal fabrication! We are a technical trading company you can rely on completely. *Case study materials available upon request.
last updated
-
[Improvement Case of Chocolate Stop] Solving the increase in work hours for replacing chuck claws and the decrease in operating rate.
By using highly wear-resistant materials for the meat serving components, we have achieved approximately four times the lifespan! Compared to when the chuck claws are newly manufactured, production costs have been reduced by 40%.
last updated