All products and services
1~30 item / All 40 items
-
"Integrated management with BIM reduces errors" Detailed design of steel structures using BIM
We will create drawings using BIM for S steel structure construction (general drawings, detailed drawings) and also produce full-scale drawings.
last updated
-
Cost reduction possible! Manufacturing of steel frames, canning, equipment, and piping prefabs from China.
Cost reduction in labor is possible compared to domestic production due to manufacturing in China! Quality is ensured through real-time dimension and appearance inspections using an online meeting system.
last updated
-
Factory and plant equipment manufacturing case study: molten iron ladle
We would like to introduce a case where we manufactured and delivered two 25-ton molten iron ladles to a steel mill!
last updated
-
Factory and plant equipment manufacturing case study: Charge bucket for melting furnace.
We handled the creation of drawings and manufacturing based on the measurement of existing dimensions for the renovation work of the existing products!
last updated
-
Factory and plant equipment manufacturing case study: Crushing equipment framework
110-ton crushing equipment framework! The manufacturing involved pre-assembly at the factory, and it was shipped in containers.
last updated
-
Factory and plant equipment manufacturing case study: Casting machine frame production
We would like to introduce a case where we manufactured a cast iron machine frame and delivered it to an alloy iron company!
last updated
-
Factory and plant equipment manufacturing case: Sintering desulfurization exhaust gas duct
We handled the detailed design, manufacturing, and offshore transportation of ducts, pipe racks, transport frames, and duct supports!
last updated
-
Factory and plant equipment manufacturing case: Receiving ladle
We would like to introduce a case where we manufactured and delivered a 5-ton weight cast iron ladle!
last updated
-
Factory and plant equipment manufacturing examples: Blast furnace water granulation manufacturing equipment, fabricated products, piping, and frames.
We will introduce a case where the frame was designed and manufactured using TEKLA Structures and the piping was designed using PLANT SPACE!
last updated
-
Factory and plant equipment manufacturing case: Thick plate heat treatment furnace
We will introduce examples of the manufacturing of the furnace body, deck, ducts, and piping for thick plate heat treatment furnaces!
last updated
-
Factory and plant equipment manufacturing case study: raw material transportation equipment
We have manufactured and delivered the belt conveyor frame to the delivery destination in Thailand!
last updated
-
Factory and plant equipment manufacturing case: Mechanical power flatbed transport vehicle
Collaborating with a Chinese special vehicle manufacturer! We have produced a flatbed transport vehicle with a maximum load capacity of 40 tons.
last updated
-
Factory and plant equipment manufacturing case: Belt conveyor assembly frame and hopper.
The drawings have been converted to Chinese materials using Tekla Structures! Fabrication drawings and construction drawings have been created.
last updated
-
Factory and plant equipment manufacturing example: Belt conveyor frame (38 tons)
The frame uses "SUS430"! The handrail and floor are made of SS400 galvanized steel, and a temporary assembly is performed to measure the camber.
last updated
-
Factory and plant equipment manufacturing case study: Gas blower casing
We have handled the production of the blower! We conducted a mock assembly and carried out a leak test.
last updated
-
Factory and plant equipment manufacturing case study: PCI deck manufacturing
Weight of 5 tons! Introducing a case of manufacturing and delivering CI decks.
last updated
-
Factory and plant equipment manufacturing case study: Arc furnace equipment
We have manufactured 6 LF equipment molten steel ladles, ladle trolleys, 2 furnace covers, and other ancillary equipment!
last updated
-
Case study of manufacturing factory and plant equipment: Production of molten steel ladles (6 units)
Weight 338 tons! Here we introduce a case of manufacturing and delivering six molten steel ladles under the guidance of our customer.
last updated
-
Case Study of Factory and Plant Equipment Manufacturing: Production of Pot Lid Stands
Among our numerous achievements, we would like to introduce a case where we manufactured and delivered a 40-ton pot lid stand!
last updated
-
Factory and plant equipment manufacturing examples: Design and production of converter auxiliary materials/alloy iron equipment.
We would like to introduce a case where we manufactured and delivered a converter auxiliary materials/alloy iron facility under the guidance of our customer!
last updated
-
Case studies of factory and plant equipment manufacturing: Dust collection hoods and dust collector framework design.
Using Tekla Structures! Introducing a case study of the design of dust hoods and dust collection system structures.
last updated
-
Factory and plant equipment manufacturing case: Belt conveyor frame (63 tons)
The frame is made of SUS430! A case of manufacturing a belt conveyor frame weighing 63 tons.
last updated
-
Factory and plant equipment manufacturing case: Belt conveyor frame (20 tons)
We manufactured a belt conveyor frame weighing 20 tons! Here is a case study of delivery on-site to the vehicle.
last updated
-
Factory and plant equipment manufacturing example: Belt conveyor frame (50 tons)
Weight 50 tons! Here is an example of delivery using an open-top container, with on-site delivery to the vehicle.
last updated
-
Case Study of Factory and Plant Equipment Manufacturing: Basalt Piping Production
Among the many achievements, we would like to introduce a case where we manufactured basalt pipes and delivered them to a steel mill!
last updated
-
Case studies of factory and plant equipment manufacturing: Basalt liners and chute manufacturing.
We would like to introduce a case of manufacturing and delivering a basalt liner and chute weighing 5 tons!
last updated
-
Case study of manufacturing factory and plant equipment: Crane girder production.
We would like to introduce a case where we manufactured a 40-ton crane girder and delivered it to a steel mill!
last updated
-
"Integrated management with BIM to reduce errors" Detailed design of steel structures using BIM
We will create drawings (general drawings, detailed drawings) using BIM for steel structure construction and also produce full-scale drawings.
last updated
-
Case studies of design and repair of factory and plant equipment - Creation of perspective models
We will introduce examples created and delivered from the completion forecast images (CG) and 3D models of the plant!
last updated
-
Case study of manufacturing factory and plant equipment: Production of 69 dampers.
We would like to introduce a case where our company manufactured 69 dampers for a waste treatment plant.
last updated