こんな課題ありませんか?「生産計画がベテラン依存で止まる」

こんな課題ありませんか?「生産計画がベテラン依存で止まる」
図面待ちのタイムロスをゼロに。先行手配とこれからの予定をまるごと連動させるFUSEの生産計画管理機能 「図面が揃わないと手配できない」「長納期部品の先行手配ができない」「生産計画がベテラン依存で止まる」という課題をお持ちの方におススメ
1~4 item / All 4 items
-
Bill of Materials (BOM) Management Function | FUSE Production Planning Management
Don't wait for the completion of the drawings! Start ordering from confirmed units before the entire BOM is completed. Next-generation BOM management that connects design and manufacturing and adapts to specification changes.
last updated
-
Material Requirements Planning (MRP) Function | FUSE Production Planning Management
Eliminate the arrangement loss of "waiting for drawings" to zero! Even with an incomplete BOM, run MRP in advance from confirmed units and dramatically shorten lead times with automatic calculations of required quantities.
last updated
-
Production Planning Scheduler Function | FUSE Production Planning Management
Graduating from the reliance on veteran plans! AI automatically creates base plans based on deadlines, workload, and equipment capacity, quickly responding to sudden specification changes.
last updated
-
AI Automatic Planning Function | FUSE Production Planning Management
Graduating from relying on veterans! An AI that has learned about deadlines, workload, and equipment capacity automatically creates plans based on this knowledge and responds instantly to sudden specification changes.
last updated