All products and services
1~8 item / All 8 items
-

Ground reinforcement RCI method for logistics warehouses
No need for concrete replacement. Addressing voids under the floor and ground subsidence without stopping production.
last updated
-

To the person in charge of factory equipment | A dangerous phenomenon that causes ground subsidence
[Must-see for Factory and Warehouse Personnel] 5-Second Floor Hazard Assessment Checklist
last updated
-

RCI construction method for new buildings | Prepare for factory floor subsidence "before building"
It's better to support it from the time of creation than to fix it after the bed has sunk.
last updated
-

RCI method
Pest and hygiene problems that cannot be controlled even with pesticide spraying may be caused by "voids and gaps under the floor."
last updated
-
RCI Jacking Method
Overwhelmingly low price and short construction period! No need for concrete replacement, allowing for floor raising work without stopping operations.
last updated
-
Anshin Guarantee
Leave it to us with peace of mind! We will check the construction site six months after the work is completed.
last updated
-

Ground reinforcement RCI method
No need for concrete replacement! Groundwork can be done without stopping operations.
last updated
-
Shinka correction
To the person in charge of factory equipment! Are you leaving the floor's tilt, sinking, unevenness, and distortion as they are?
last updated