納期短縮事例
納期短縮事例
VA/VEによる納期短縮事例をご紹介いたします。
1~5 件を表示 / 全 5 件
-

[VA/VE Case] Reduced lead time for parts production by one week through elimination of plating.
The appropriate use of ZAM materials leads to an extension of product life and a reduction in maintenance frequency, contributing to a reduction in total costs.
最終更新日
-

[VA/VE Case] Achieved up to 30% cost reduction with galvanized steel sheets.
Contributing to the enhancement of product added value while balancing design, practicality, and cost reduction.
最終更新日
-

[VA/VE Case] Significant Cost Reduction through Powder Coating Reduction
By abolishing the painting process, significant cost improvements in material costs, labor costs, equipment costs, and waste liquid treatment costs are possible.
最終更新日
-

[VA/VE Case] Reduction of mold costs during prototyping using resin molds.
It is suitable for the production of molds for final products and for low-risk, high-speed verification of functionality, shape, and assembly before mass production.
最終更新日
-

[VA/VE Case] Improvement of Prototype Cost and Lead Time through the Use of Stacked Jigs
We contribute to our customers by standardizing welding quality, reducing defect rates, and stabilizing costs!
最終更新日