納期短縮事例

納期短縮事例
VA/VEによる納期短縮事例をご紹介いたします。
1~5 item / All 5 items
-

[VA/VE Case] Reduced lead time for parts production by one week through elimination of plating.
The appropriate use of ZAM materials leads to an extension of product life and a reduction in maintenance frequency, contributing to a reduction in total costs.
last updated
-

[VA/VE Case] Achieved up to 30% cost reduction with galvanized steel sheets.
Contributing to the enhancement of product added value while balancing design, practicality, and cost reduction.
last updated
-

[VA/VE Case] Significant Cost Reduction through Powder Coating Reduction
By abolishing the painting process, significant cost improvements in material costs, labor costs, equipment costs, and waste liquid treatment costs are possible.
last updated
-

[VA/VE Case] Reduction of mold costs during prototyping using resin molds.
It is suitable for the production of molds for final products and for low-risk, high-speed verification of functionality, shape, and assembly before mass production.
last updated
-

[VA/VE Case] Improvement of Prototype Cost and Lead Time through the Use of Stacked Jigs
We contribute to our customers by standardizing welding quality, reducing defect rates, and stabilizing costs!
last updated