佐々木環境化学 Official site

[Energy-saving case study of a food factory] Cleaning and heat-insulating coating of outdoor air conditioning units.

[Energy-saving case study of a food factory] Cleaning and heat-insulating coating of outdoor air conditioning units.

[Energy-saving case study of a food factory] Cleaning and heat-insulating coating of outdoor air conditioning units.

In the case of a cleaning and heat-insulating coating applied to the outdoor air conditioning unit of a major food factory, the construction cost was approximately 1.8 million yen, resulting in a payback period of 6.4 months, which is noteworthy as it represents a relatively short span for typical investment recovery.

1~12 item / All 12 items

Displayed results