[Energy-saving case study of a food factory] Cleaning and heat-insulating coating of outdoor air conditioning units.
Achieved a 14.8% reduction in annual air conditioning costs through cleaning and heat-insulating coatings! *A collection of case studies from four industries is currently being offered.
In the materials available for download below, you can find case studies of construction verification results by industry. Among them, a notable case is the cleaning and heat-insulating painting performed on the outdoor air conditioning unit of a major food factory, where the construction cost was approximately 1.8 million yen, resulting in a payback period of 6.4 months, which is a relatively short span for typical investment recovery. 【Overview】 ■ Verification Method - We received the electricity consumption and costs before and after construction from the customer to verify the effects. ■ Verification Results - Successfully achieved a reduction of 14.8% (6.12 million yen). - The payback period for the construction costs was 6.4 months, which is a short span for typical investment recovery. *For other industry-specific construction verification case studies, please download the catalog or feel free to contact us.
basic information
For more details, please download the catalog or feel free to contact us.
Price range
Delivery Time
Model number/Brand name
Sasakan-style air conditioning outdoor unit cleaning and heat-insulating coating
Applications/Examples of results
For more details, please download the catalog or feel free to contact us.