[Construction Effect Verification Case] Major Food Factory Air Conditioning Outdoor Unit
The payback period is 6.4 months, which is a short span for a typical investment recovery!
We would like to introduce a case study on the effectiveness of cleaning and heat-insulating coatings applied to the outdoor air conditioning units of a major food factory. The verification method involved receiving the electricity consumption and costs from the customer before and after the installation to assess the effectiveness. As a result of the installation, we successfully achieved a reduction of 14.8% (6.12 million yen). The payback period for the installation costs is 6.4 months, which is notably short for typical investment recovery. 【Case Overview】 ■ Verification Method - Received electricity consumption and costs from the customer before and after the installation to assess effectiveness. ■ Verification Results - Successfully achieved a reduction of 14.8% (6.12 million yen). - The payback period for the installation costs is 6.4 months, which is notably short for typical investment recovery. *For more details, please download the PDF or feel free to contact us.
basic information
For more details, please download the PDF or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please download the PDF or feel free to contact us.