佐々木環境化学 Official site

[Construction Effect Verification Case] Major Food Factory Air Conditioning Outdoor Unit

The payback period is 6.4 months, which is a short span for a typical investment recovery!

We would like to introduce a case study on the effectiveness of cleaning and heat-insulating coatings applied to the outdoor air conditioning units of a major food factory. The verification method involved receiving the electricity consumption and costs from the customer before and after the installation to assess the effectiveness. As a result of the installation, we successfully achieved a reduction of 14.8% (6.12 million yen). The payback period for the installation costs is 6.4 months, which is notably short for typical investment recovery. 【Case Overview】 ■ Verification Method - Received electricity consumption and costs from the customer before and after the installation to assess effectiveness. ■ Verification Results - Successfully achieved a reduction of 14.8% (6.12 million yen). - The payback period for the installation costs is 6.4 months, which is notably short for typical investment recovery. *For more details, please download the PDF or feel free to contact us.

Related Link - https://sasaki-kankyo.com/

basic information

For more details, please download the PDF or feel free to contact us.

Price range

Delivery Time

Applications/Examples of results

For more details, please download the PDF or feel free to contact us.

Construction Verification Results Case Study: "Sasakan Method Air Conditioning Outdoor Unit Cleaning and Heat-Resistant Coating"

TECHNICAL

News about this product(1)

Recommended products

Distributors