Chassis modification
The delivery time from order to completion is approximately 3 to 4 months! Remote control PTO units can be installed on all vehicle models.
We would like to introduce the modifications to chassis being carried out by Shinmei Industrial Co., Ltd. The delivery time from order to completion is approximately 3 to 4 months. We adhere to the mounting standards and perform modifications that are safe and of high quality. Our scope of work includes relocating auxiliary equipment, extending, shortening, and reinforcing frames, and vehicle electrical control. We can accommodate small to large trucks and can install remote control PTO units on all vehicle types. 【Features】 ■ Modifications that comply with mounting standards ■ Short delivery times achieved through line processes ■ Comprehensive service from proposals before modifications to registration documents after modifications ■ Installation of Shinmei exclusive units *For more details, please refer to the PDF materials or feel free to contact us.
basic information
【Scope of Work】 ■ Relocation of auxiliary equipment ■ Frame extension, shortening, and reinforcement ■ Vehicle electrical control ■ Rewinding of genuine parts such as PTO ■ Extraction of modified wiring for superstructure ■ Complete painting of cab/frame ■ Installation of remote control PTO unit *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.