Stem End Cap & Rush Adjuster Assembly Machine
Introduction of Stem End Cap & Rush Adjuster Assembly Machine
The cylinder heads are automatically transported with the pallet and the stem end caps are assembled. The rush adjuster is fed from the back of the equipment for assembly. <Specifications> Number of assembly points: 16 each, total of 32 points Cycle time: 54 seconds (including 10 seconds for loading and unloading) Transport height: 860mm Equipment size: Depth 3400mm × Width 1500mm × Height 1800mm Primary air: 0.3MPa 3/8 Primary power supply: 200V 11.8KVA
basic information
For more details, please contact us through our website.
Price range
Delivery Time
Applications/Examples of results
For more details, please contact us through our website.