新明工業 Official site

Stem End Cap & Rush Adjuster Assembly Machine

Introduction of Stem End Cap & Rush Adjuster Assembly Machine

The cylinder heads are automatically transported with the pallet and the stem end caps are assembled. The rush adjuster is fed from the back of the equipment for assembly. <Specifications> Number of assembly points: 16 each, total of 32 points Cycle time: 54 seconds (including 10 seconds for loading and unloading) Transport height: 860mm Equipment size: Depth 3400mm × Width 1500mm × Height 1800mm Primary air: 0.3MPa 3/8 Primary power supply: 200V 11.8KVA

Related Link - https://www.shinmei.co.jp/service/motorized/

basic information

For more details, please contact us through our website.

Price range

Delivery Time

Applications/Examples of results

For more details, please contact us through our website.

Recommended products

Distributors