[SDGs Measures] Kyocera EPA Solar Power Generation System with Zero Initial Cost
We will transfer the Kyocera panels, which have over 30 years of proven performance centered in the Tokai region (Aichi, Gifu, Mie), along with the solar power generation system, after 20 years.
[Kyocera Panels] You can use them with peace of mind even after the transfer. After 30 years, the output degradation rate is only 13% based on actual results. PPA (Power Purchase Agreement) is where the implementing company provides space such as land or rooftops, and Tōei Denki installs solar power generation systems and other generating equipment free of charge. The PPA operator measures and bills for the amount of electricity consumed, and the implementing company pays for that electricity. [Companies facing these challenges] - Want to reduce the installation costs of solar power systems - Considering specific actions for CO2 reduction and environmental measures Please contact Tōei Denki's "Solar Business Division (New Energy)" once. *Feel free to inquire about CO2 reduction amounts, installation methods, etc. ■ Over 35 years of experience in the solar power business ■ A "certified technical agent" of Kyocera, known for high design technology ■ Over 100 achievements in local government and public projects (including 30 schools)
basic information
At Toei Electric Industry, we will transfer Kyocera panels, which have over 30 years of proven performance, along with the solar power generation system after 20 years. 【Implementation Example】 PPA Implementation Case (Kyoto, Manufacturing Industry) Roof Area: 1,900m² Solar Cells: 174.2kW Inverter Capacity: 100kW Contract Duration: 20 years Contract Price: 11 yen/kWh Annual Power Generation (Estimated): 186,572 kWh/year Annual Electricity Cost Reduction: 1,980,000 yen CO2 Reduction (over 20 years): 2020 tons/year
Price range
Delivery Time
Applications/Examples of results
Over 100 achievements in local government and public projects (including 30 schools).