Electric valve storage box SBK-25K
The drainage function during testing keeps the sprinkler piping dry without filling it with water! Due to the electric three-way valve, connecting it to the water supply prevents stagnant water!
It operates based on signals from the electric valve control panel SBK-25Z of the specific facility water supply connection type sprinkler system (dry type).
basic information
■ Electric Valve Storage Box SBK-25K Specifications External Dimensions: W=600mm H=400mm D=200mm Body Material: Steel Plate t=1.6 Color: Approximate color 2.5Y9/1 with 5% gloss Weight: Approximately 23kg Internal Piping: Lead-free ball valve, electric three-way valve, manual three-way valve (for testing and drainage), manual release valve (for emergency), manual release valve (for electric three-way valve shaft) (for emergency) *All are certified products by the Japan Water Works Association, Nominal Diameter 25A * A water supply pipe with a nominal diameter of 25A or larger is required. * Please install it at least 800mm above the ground. * To prevent stagnant water, please install it close to the branch point of the water supply piping or connect it to a water supply faucet or sprinkler faucet. * Please take measures against freezing for the primary side piping inside the storage box. * Please apply caulking treatment to the installation surfaces with the wall on the top and sides. * For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Model number/Brand name
SBK-25K
Applications/Examples of results
【Examples of Use】 ■Hospital ■Inpatient Clinic ■Group Home ■Single-family House ■Apartment Building ■Small-scale Facility *For more details, please refer to the PDF document or feel free to contact us.
Detailed information
-
[Normal valve position and water flow] Water enters from A and flows to the right (primary side) via B (electric three-way valve). When a signal is received from the control panel (during a fire), B (electric three-way valve) operates and changes the water flow to the left (secondary side), filling the fire extinguishing pipe. *Please set the handle at A vertically, the handle at C vertically, and the handle at D vertically.
-
[Position of the valve and water flow during testing] If you are testing whether B (electric three-way valve) operates normally without filling the fire protection pipe, please position the handle C horizontally. *After the test is completed, please return the handle C to the vertical position.
-
[Position of the valve and water flow during drainage] When draining the water filled in the fire protection pipe, please turn the handle C to the right at a 45° angle to drain the water. After the drainage is complete, please return the handle C to the vertical position.
-
[Position of the valve and water flow in an emergency] If for some reason B (electric three-way valve) does not operate, you can fill the fire extinguishing pipe by turning the handle D horizontally. *Note: D should never be opened (handle horizontal) during normal conditions.
Related Videos
catalog(6)
Download All Catalogs



