catalog
Please complete the inquiry form to access eBook details
-
Monitoring the structural integrity of buildings 365 days a year using fine vibration data [log365 Building Structure Monitoring]
Contact this catalog
-
-
Inside sales implementation support service specialized for manufacturing and construction industries [Urettech InsideON]
Contact this catalog
-
Floor subsidence correction, void filling under the floor, and building tilt correction work in Asian countries.
Contact this catalog
-
-
-
-
-
Settlement Correction / Void Filling: Construction Case Studies - TerraTech Method
Contact this catalog
-
-
-
-
The first step in factory and warehouse automation starts with floor leveling: Teratec method.
Contact this catalog
-
[Construction Case] Funabori Co., Ltd. (Manufacturing Factory) "Teratech Method"
Contact this catalog
-
[Inclination/Subsidence/Step Difference/Cavity Filling] "TerraTech Method" Correction of subsidence in concrete floor slabs due to ground subsidence or disasters.
Contact this catalog
-
-
-
-
[Guarantee] Overview document for the 10-year warranty service "Teratec Plus 10"
Contact this catalog
-
[Ground Improvement] Correction of Building Tilt and Ground Improvement Method Directly Under the Building
Contact this catalog
-
"Void filling" with the option to choose between permeable and impermeable 'cement-based lightweight' filling and embankment construction methods.
Contact this catalog
-
Customer Feedback Vol. 1: Chuo Packing Transport Co., Ltd. (Warehouse) "Teratek Method"
Contact this catalog
-
Customer Feedback Vol. 2: Akebono Sangyo Co., Ltd. (Manufacturing Plant) "Teratek Method"
Contact this catalog
-
Customer Voice Vol. 3: Oruichi Co., Ltd. (Refrigerated Warehouse) "Teratek Method"
Contact this catalog
-
-
"MPD Pipe" - A drainage pipe with excellent water collection performance, strength, and maintainability.
Contact this catalog
-
[Case Studies of Safety Measures] Leveling a Tilted Floor in a Short Time! Teratec Method
Contact this catalog
-